2021 International Building Code®

Grouped product items
Qty Format Price Member Price Member Savings
Soft Cover

Item #: 3000S21

$156.00
Volume Discount
Quantity Price
1-24 $156.00
25-49 $148.20
50-99 $140.40
100 and up $132.60
$117.00
Volume Discount
Quantity Price
1-24 $117.00
25-49 $111.15
50-99 $105.30
100 and up $99.45
$39.00
Loose Leaf

Item #: 3000L21

$178.00
Volume Discount
Quantity Price
1-24 $178.00
25-49 $169.10
50-99 $160.20
100 and up $151.30
$134.00
Volume Discount
Quantity Price
1-24 $134.00
25-49 $127.30
50-99 $120.60
100 and up $113.90
$44.00
PDF/Redline Download

Item #: 8700PR21

$140.00
Volume Discount
Quantity Price
1 $140.00
2 $105.00
3-4 $98.00
5-9 $84.00
10 and up $77.00
$105.00
Volume Discount
Quantity Price
1 $105.00
2 $78.75
3-4 $73.50
5-9 $63.00
10 and up $57.75
$35.00
Soft Cover & PDF/Redline Download

Item #: 3000SPR21

$206.00
$155.00
$51.00
Loose Leaf & PDF/Redline Download

Item #: 3000LPR21

$222.00
$167.00
$55.00

This code applies to all buildings except detached one- and two-family dwellings and townhouses up to three stories. The 2021 IBC® contains many important changes such as:

  • Puzzle rooms (escape rooms) are now defined and regulated as special amusement areas, requiring compliance with Section 411 and special means of egress requirements.
  • For the purposes of determining the allowable number of control areas in a building, each portion separated by one or more fire walls is now considered as a separate building.
  • In Group E occupancies, enhanced classroom acoustics in compliance with ICC A117.1 are to be provided in all classrooms having of volume of 20,000 cubic feet or less.
  • The requirements for metal composite materials and systems (MCM) installed on the exterior walls of Types I, II, III and IV construction were simplified and sprinkler allowances were deleted
  • The use of intermodal shipping containers as buildings is now specifically addressed through provisions intended to supplement existing applicable IBC requirements.
  • Automatic sprinkler protection is now required in Group S-2 open parking garages where any fire area exceeds 48,000 square feet.
  • The 2017 edition of ICC A117.1 was adopted.
  • Parapets of a minimum height are now required for aggregate-surfaced roofs to prevent blow-off.
  • Mixed occupancy buildings with assembly spaces are placed in Risk Category III when the total public assembly occupant load is greater than 2500 people.
  • The 2021 IBC snow map is updated to match ASCE 7-16 snow maps by adding a reference to ASCE 7 snow tables in states with large case study areas.
  • Secondary rain loads are updated to be consistent with ASCE 7.
  • Special inspection requirements were added to address the anchorage and connection of mass timber structural elements.
  • Installation of firestop, fire-resistant joint systems and perimeter fire barrier systems in residential-use buildings now requires special inspection in Group R fire areas having an occupant load exceeding 250 people.
  • Frost protection for egress doors was added to the foundation requirements.
  • ACI standards ACI 117 and ITG 7 were added by reference to provide acceptable tolerances for concrete construction.
  • Three new types of construction (Types IV-A, IV-B, and IV-C) allow mass timber buildings of taller heights, more stories above grade, and greater allowable areas compared to existing provisions for heavy timber buildings.
More Information
Description: Links

Front Matter (Title Page, TOC, Preface and Forward)

Referenced Standards

Publisher ICC
This site has been tested and optimized for Firefox, Safari, Chrome and Internet Explorer 10+. We recommend users of early versions of Internet Explorer to update to Version 11 or later.