More Views

2018 International Existing Building Code®

Quantity Format Price Member Price Member Savings

premiumACCESS Subscription

Price:
$---.--
Member Price:
$---.--
Member Savings:
$---.--

Loose Leaf

Item #:3550L18

Price:
$89.50
volume discount
Member Price:
$67.25
volume discount
Member Savings:
$22.25

Soft Cover

Item #:3550S18

Price:
$77.25
volume discount
Member Price:
$58.00
volume discount
Member Savings:
$19.25

Loose Leaf & PDF/Redline Download

Item #:3550LPR18

Price:
$116.00
Member Price:
$87.00
Member Savings:
$29.00

Soft Cover & PDF/Redline Download

Item #:3550SPR18

Price:
$108.00
Member Price:
$81.00
Member Savings:
$27.00

PDF/Redline Download

Item #:8755PR18

Price:
$77.25
Member Price:
$58.00
Member Savings:
$19.25
Overview

Front Matter (Title Page, TOC, Preface and Forward)

Referenced Standards

Encourages the use and reuse of existing buildings. This code covers repair, alteration, addition and change of occupancy for existing buildings and historic buildings, while achieving appropriate levels of safety without requiring full compliance with the new construction requirements contained in the other I-Codes. For the most current adoptions details go to International Code Adoptions

Key changes include:

  • Section 410 Accessibility has been relocated to a new Section 305. Chapters 4, 5, 6, 13 and 14 have been relocated resulting in a reorganization and new chapter numbering.
  • Requirements for live loads from Chapters 4 and 8 have been combined and placed in Chapter 3 to apply for all compliance methods.
  • Structural components damaged by snow events must be repaired assuming snow loads for new buildings from the IBC.
  • A new exception is added for loading of existing structural elements next to an addition in buildings designed using the IRC.
  • When a work area includes more than half the building in an alteration, wall anchors must be installed at the roof line along reinforced concrete and masonry walls.
  • Buildings undergoing a change of occupancy shall have live, snow, wind and seismic loads checked. Design loads are based on IBC-level forces.
  • When a change of occupancy occurs placing a building in a higher risk category, the seismic loads on the building must be evaluated using IBC-level forces. Access to the building must be maintained when passing through or near other buildings and structures.
  • Where storm shelters are required based on IBC and ICC 500 for Group E Occupancies, any addition to such existing occupancies where the occupant load of the addition is 50 or more will trigger the construction of a storm shelter.
  • Carbon Monoxide provisions have been added in the Prescriptive Method Additions, Alterations Level 2 Additions, and in Additions for I-1, I-2, I-4 and R Occupancies.
  • Emergency Escape and Rescue Opening provisions related to being operational have been added to Prescriptive Compliance Method and Alterations Level 1.
  • Single exit buildings and spaces under Alteration Levels 2 and 3 have been modified to be more consistent with the IBC.
  • The Alterations Level 2 requirement that water for automatic fire sprinkler system be available at the floor of alteration without the need for a fire pump has been moved to Chapter 9 for Alterations Level 3 and the fire pump criterion was deleted.

 

PURCHASE THE PDF/REDLINE DOWNLOAD VERSION AND GET IMMEDIATE ACCESS!!! The PDF/Redline Download option contains PDF files of both the base I-Code and a Redline version of the I-Code which shows changes from the previous edition marked in the color red. With the Redline you can quickly spot changed sections and tell specifically what has been changed from the previous edition, saving time and confusion. This option is mobile friendly and compatible with all devices, including mobile tablets and smart phones. It requires a PDF Reader. Use on a local area network or other network is not permitted.

 ALL PDF/REDLINE DOWNLOAD SALES ARE FINAL.

For ICC certification examination rules related to exam reference materials review Test Site Regulations

Details
Publisher:
ICC

Encourages the use and reuse of existing buildings. This code covers repair, alteration, addition and change of occupancy for existing buildings and historic buildings, while achieving appropriate levels of safety without requiring full compliance with the new construction requirements contained in the other I-Codes. Key changes include:

  • Section 410 Accessibility has been relocated to a new Section 305. Chapters 4, 5, 6, 13 and 14 have been relocated resulting in a reorganization and new chapter numbering.
  • Requirements for live loads from Chapters 4 and 8 have been combined and placed in Chapter 3 to apply for all compliance methods.
  • Structural components damaged by snow events must be repaired assuming snow loads for new buildings from the IBC.
  • A new exception is added for loading of existing structural elements next to an addition in buildings designed using the IRC.
  • When a work area includes more than half the building in an alteration, wall anchors must be installed at the roof line along reinforced concrete and masonry walls.
  • Buildings undergoing a change of occupancy shall have live, snow, wind and seismic loads checked. Design loads are based on IBC-level forces.
  • When a change of occupancy occurs placing a building in a higher risk category, the seismic loads on the building must be evaluated using IBC-level forces. Access to the building must be maintained when passing through or near other buildings and structures.
  • Where storm shelters are required based on IBC and ICC 500 for Group E Occupancies, any addition to such existing occupancies where the occupant load of the addition is 50 or more will trigger the construction of a storm shelter.
  • Carbon Monoxide provisions have been added in the Prescriptive Method Additions, Alterations Level 2 Additions, and in Additions for I-1, I-2, I-4 and R Occupancies.
  • Emergency Escape and Rescue Opening provisions related to being operational have been added to Prescriptive Compliance Method and Alterations Level 1.
  • Single exit buildings and spaces under Alteration Levels 2 and 3 have been modified to be more consistent with the IBC.
  • The Alterations Level 2 requirement that water for automatic fire sprinkler system be available at the floor of alteration without the need for a fire pump has been moved to Chapter 9 for Alterations Level 3 and the fire pump criterion was deleted.